Step Process Description Lead Time
1 Inquiry -Provide 2D/3D drawings.
-Expected batch quantity and yearly demand.
-Special requirements: critical surface, burr-free finish, export packaging, etc.
~3 days
2 Quotation -Quotation based on drawings and volume(annual /per batch) ~3–5 days
3 Order Confirmation -Confirm order details and delivery schedule. ~3–5 days
4 Tooling & Prototype Approval -Select suitable processes based on design requirements:
     *Raw parts (casting, forging, stamping, plastic injection)
     *CNC machining (turning, milling, drilling, grinding, straightening, etc.)
     *Surface treatment (polishing, sandblasting, electroplating, ED coating, powder coating)
-Tooling or machining from raw material, laser cutting.
-Sample delivery
~30–60 days
5 Mass Production -Production is based on approved samples and MOQ ~30–120 days
6 Quality Control & Packing -Dimensional check (critical functions verified with gauges).
-Visual inspection (including critical surfaces, burrs, and finishing as required)
-Weighing inspection (to ensure integrity) -Packaging focuses on product protection.
~3–5 days
7 Delivery Estimated transit time (example: Taiwan → Europe)
-Sea freight: ~60 days (after customs clearance)
-Air freight: ~10 days
-Express: ~3 days
Inspection upon Receipt: 5–10 days